2026 HTSUS REV 23 HTS Lines: 19,831 FY27 MPF: 0.3464% ($34.58-$670.86) HMF (Ocean): 0.125% De Minimis: $0 Global Sec. 301 Stack: July 24, 2026
Sources: USITC HTSUS • CBP 91 FR 48398 • USTR Sec. 301
USTariffIndex Official HTSUS & Landed Cost Bureau
4-Digit HTSUS Heading36 10-Digit Codes

Heading 4411 — Fiberboard of wood or other ligneous materials, whether or not bonded with resins or other organic substances

4-digit tariff heading under Chapter 44: Wood and articles of wood; wood charcoal. Contains 6 international 6-digit HS subheadings and 36 U.S. 10-digit statistical codes (avg MFN 1.2%).

6-Digit HS Subheadings in Heading 4411

10-Digit HTSUS Statistical Lines (36)

10-Digit HTSDescriptionBase MFNChina 301
4411.12.10.00 Not mechanically worked or surface covered Free +25%
4411.12.20.00 Laminated boards bonded in whole or in part, or impregnated, with synthetic resins 1.9¢/kg + 1.5% +25%
4411.12.30.00 Other Free +25%
4411.12.60.00 Not surface covered (except for oil treatment) Free +25%
4411.12.90.10 Standard wood molding 3.9% +25%
4411.12.90.90 Other 3.9% +25%
4411.13.10.00 Not mechanically worked or surface covered Free +25%
4411.13.20.00 Laminated boards bonded in whole or in part, or impregnated, with synthetic resins 1.9¢/kg + 1.5% +25%
4411.13.30.00 Other Free +25%
4411.13.60.00 Not surface covered (except for oil treatment) Free +25%
4411.13.90.10 Standard wood molding 3.9% +25%
4411.13.90.90 Other 3.9% +25%
4411.14.10.00 Not mechanically worked or surface covered Free +25%
4411.14.20.00 Laminated boards bonded in whole or in part, or impregnated, with synthetic resins 1.9¢/kg + 1.5% +25%
4411.14.30.00 Other Free +25%
4411.14.60.00 Not surface covered (except for oil treatment) Free +25%
4411.14.90.10 Standard wood molding 3.9% +25%
4411.14.90.90 Other 3.9% +25%
4411.92.10.00 Not mechanically worked or surface covered Free +25%
4411.92.20.00 Not surface covered (except for oil treatment) Free +25%
4411.92.30.00 Tileboard which has been continuously worked along any of its edges and is dedicated for use in the construction of walls, ceilings or other parts of buildings Free +25%
4411.92.40.00 Other 6% +25%
4411.93.10.00 Not mechanically worked or surface covered Free +25%
4411.93.20.00 Laminated boards bonded in whole or in part, or impregnated, with synthetic resins 1.9¢/kg + 1.5% +25%
4411.93.30.00 Other Free +25%
4411.93.60.00 Not surface covered (except for oil treatment) Free +25%
4411.93.90.10 Standard wood molding 3.9% +25%
4411.93.90.90 Other 3.9% +25%
4411.94.00.10 Impregnated with bitumen Free +25%
4411.94.00.20 Other Free +25%
4411.94.00.30 Impregnated with bitumen Free +25%
4411.94.00.40 Other Free +25%
4411.94.00.50 Impregnated with bitumen Free +25%
4411.94.00.60 Other Free +25%
4411.94.00.70 Impregnated with bitumen Free +25%
4411.94.00.80 Other Free +25%